Do I need planning permission for my extension?
Not always. Some extensions and alterations fall under permitted development, while others need a householder planning application. It comes down to size, position and height, the type of property, whether permitted development rights have been removed, and where the property sits. Tell us what you have in mind and we’ll say which is likely to apply.
What drawings are needed for a planning application?
Usually existing and proposed floor plans, existing and proposed elevations, a site plan and a location plan — plus sections or a design and access statement where they’re relevant. Each council asks for slightly different things, so we agree the drawing package with you before work begins.
Do I need Building Regulations approval?
Most extensions, structural alterations and new homes do. It’s a separate approval from planning permission, normally handled with detailed construction drawings and input from an engineer. Building Regulations work isn’t part of our planning-stage service unless we agree it separately in writing.
Will I need structural calculations?
If you’re taking out load-bearing walls, adding steel beams, forming new openings or changing the structure in a significant way, you’ll normally need calculations from a qualified structural engineer. We flag it early so it can be priced and planned alongside the design work.
Can you guarantee that planning permission will be approved?
No — and no architect, technologist or practice can. Decisions are made by your local planning authority against national policy, the development plan and local considerations. What we can do is prepare accurate, clearly presented drawings and information so your application is properly made and fairly considered.
How much will the design work cost?
It depends on the scope: the type of project, how many drawings are needed, whether an application is required and how much development work is involved. We confirm the scope and fee in writing before starting. Council application fees are separate and paid to the council directly.
How long does the process take?
Design work usually takes a few weeks, depending on complexity and how quickly decisions get made. Councils publish their own determination periods and some applications take considerably longer. We’ll give you a realistic programme for our part of the work at the outset.
Which areas do you cover?
Doncaster, South Yorkshire, North Lincolnshire and the areas around them. If you’re further afield, get in touch — projects are considered case by case, depending on the type of work and the involvement needed.
What should I prepare before we speak?
Helpful, but not essential: a rough idea of what you want, any measurements or plans you already hold, a few photos of the house and garden, and a sense of your budget and timescale. A first conversation works without any of it — it just makes the discussion more useful.
What happens after I send an enquiry?
We read every enquiry ourselves and reply the way you’ve asked us to, usually to clarify a few things about the property and the project. If it looks like a good fit, we’ll suggest a short conversation and then set out the proposed scope of work and fee in writing.